Sangamon River Bridge Trail

Featuring -

  • 0.6 mile long concrete surface trail through a scenic wooded area and crossing the Sangamon River. Railroad St. to County Farm Road
  • 0.6 mile long concrete surface trail through a scenic wooded area from County Farm Road to Green Apple Lane.
  • New addition also for 2021 is a Story Walk along the west end of the trail. This is made possible through a partnership of Allerton Public Library and Kirby Hospital.  Stories will change every few weeks.
  • Entire Trail made possible by the generosity of Heartland Pathways and assistance from the Monticello Township.
  • Ideal for running, walking, roller blading or bicycling